About the project

The Victorian Government is removing 18 level crossings and building 12 new stations as part of a $3 billion upgrade along the Frankston line that will improve safety, reduce congestion and allow more trains to run more often.

Major construction to remove five dangerous and congested level crossings and build three new stations in Edithvale, Chelsea and Bonbeach begins in July 2021.

We’ll be excavating the rail trenches, lowering sections of the Frankston line and building roads over the rail trenches.

By the end of this year, these communities will be level crossing free, with safer road connections and three new modern stations open.

Community Information Sessions now online

Due to current coronavirus lockdown restrictions across Melbourne, our previously scheduled community information sessions have been postponed and moved online.

The times for the virtual sessions are:

  • 6pm to 7.30pm Tuesday 20 July
  • 10.30am to 12pm Wednesday 21 July

Accessing Zoom

The virtual sessions will be hosted on Zoom.

Please note you need to log into your Zoom account and log in before accessing the below links.

The below links will become live once the session starts – feel free to drop by, no registration needed.

Having technical issues accessing the meeting?

Call us on 1800 105 105 during the meeting and you will be transferred to our I.T. expert for live technical assistance over the phone.

Edithvale, Chelsea and Bonbeach designs

New Chelsea pedestrian bridge

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Level Crossing Removal Project

{{ question.title }}

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found