CLOSED: This survey has concluded.

Welcome to our survey. We're keen to hear from you about level crossing removals in your area. This survey should take about 5 to 10 minutes to complete. Feel free to skip sections (unless they are marked with an *).

Thanks for taking the time to provide us with your feedback.

Level crossing removal option 1

Lower the rail line into a trench and build two new road bridges at Charman Road and Park Road at the current road level.

Key information

  • Depth of rail trench approximately 8 metres
  • Multi-level car park
  • Width of rail trench approximately 30 metres
  • Dual pedestrian crossings
  • One pedestrian overpass
  • Length of rail trench approximately 1260 metres

Level crossing removal option 2

Raise the rail line over Charman Road and Park Road and retain the existing road level.

Key information

  • Height of rail bridge approximately 10 metres
  • Width of rail bridge approximately 23 metres
  • Length of rail bridge approximately 1650 metres